Somerset Electrical Company were instructed by Alpha Waste Water Services to install a supply to a recent waste water tank and pump installation that they had carried out to a large domestic property in Taunton.

Somerset Electrical Company conducted a site survey to ascertain the length of run from the property to the pump control box to size the supply cable accordingly.

The SWA supply cable was connected to both ends via isolation switches to allow for local and remote isolation. We installed a neon system at the pump control box so as to allow the customer to visibly see from a distance when the pump was running.

Somerset Electrical Company have carried out many projects for Alpha Waste Water Services throughout the south west.